The period of 1999-2006

  1. Modernization of electric power supply of Kumkol Oil Plump Station.
  2. Reconstruction of electric power supply of Atyrau Oil Plump Station 663 km.
  3. Project – External electric power supply of Kenkiyak-Atyrau oil pipeline.
  4. Detailed design “Frequency-controlled drive of Kalamkas Oil Plump Station”.
  5. Reconstruction of electric power supply of Bolshoy Chagan Oil Plump Station.
  6. Detailed design “Transformer substation 110/6-6 kV with 110 kV HV line for Plato Preliminary Water Removal Unit” (customer UzenMunayGaz JSC).
  7. Detailed design “Transformer substation 110/6-6 kV with 110 kV HV line for Vpadina Preliminary Water Removal Unit” (customer UzenMunayGaz JSC).
  8. Atasu-alashankou Oil Pipeline, external electric power supply of Oil Plump Station-9 pump station. 10 kV line laid along the road route.

The period of 2007-2009

“Electric power supply of Kigach Line Operation Dispatcher Station”

Site: Kigach Line Operation Dispatcher Station
Customer: Kaztransoil JSC
Construction period: 2007-2009
Brief description of the project:

  • contract date – 2007
  • site geographic location– Atyrau Region
  • types of executed works – design and survey work, construction and installation work, commissioning
  • company units involved – Branch of TPEP Limited Liability Partnership in the city of Taraz
  • task completion date – 2009

“Reconstruction of electric power supply of terminals No. 9,10” and “Reconstruction of Switchboard-0,4 diesel power station DC/DC converter”

Site: Aktau Initial Pump Station
Customer: Kaztransoil JSC
Construction period: 2007
Brief description of the project:

  • contract date – 2007
  • site geographic location – Mangistau Region, the city of Aktau
  • types of executed works – design and survey work, construction and installation work, commissioning
  • company units involved – Branch of TPEP LLP in the city of Taraz
  • task completion date 2007

Repair of 10 kV HV line, 128 km “Astrakhan-Mangyshlak”

Site: Kigach Line Operation Dispatcher Station
Customer: Kaztransoil JSC
Construction period: 2008-2009
Brief description of the project:

  • contract date – 2007
  • site geographic location- Atyrau Region
  • types of executed works – construction and installation work, commissioning
  • company units involved – Branch of TPEP LLP in the city of Taraz
  • task completion date – 2009

Repair of 10 kV HV line, 127 km “Kiyakty-Kaydak”

Site: HV line in Kiyakty-Kaydak area
Customer: Kaztransoil JSC
Construction period: 2007-2008
Brief description of the project:

  • contract date – 2007
  • site geographic location – Mangistau Region
  • types of executed works – construction and installation work, commissioning
  • company units involved – Branch of TPEP LLP in the city of Taraz
  • task completion date 2008

Заказчик: АО «Алатау Жарык Компаниясы»
Сроки строительства: 8 месяцев
Краткое описание проекта:

  • дата заключения контракта – 10.12.2009г.,
  • виды выполненных работ СМР, ПНР
  • задействованные подразделения компании – строительные бригады ТОО «ТПЭП» и субподрядчиков

Заказчик: ТОО «Самрук-ЭнергоСтройСервис»
Сроки строительства: 13,5 месяцев
Краткое описание проекта:

  • дата заключения контракта – 30.04.2010г.
  • виды выполненных работ СМР, ПНР
  • задействованные подразделения компании – строительные бригады ТОО «ТПЭП» и субподрядчиков

Заказчик: ГУ «Управление энергетики и коммунального хозяйства города Астаны»
Сроки строительства: до конца апреля 2012г.
Краткое описание проекта:

  • дата заключения контракта – 29.10.2010г.
  • виды выполненных работ СМР, ПНР
  • задействованные подразделения компании – строительные бригады ТОО «ТПЭП» и субподрядчиков

Заказчик: ГУ «Управление энергетики и коммунального хозяйства города Астаны»
Сроки строительства: до конца октября 2012г.
Краткое описание проекта:

  • дата заключения контракта – 08.04.2011г.
  • виды выполненных работ СМР, ПНР
  • задействованные подразделения компании – строительные бригады ТОО «ТПЭП» и субподрядчиков